TESTIMONIALS
Jock worked with the tight timeframes we gave him & took the time to explain things
Growgrass™ were able to provide us with a cost effective soft-scape solution at very short notice to rehabilitate some very steep batters on the Toowoomba Range Remediation Project. Jock and his team were very easy to work with, having flexibility in program of works with their set up of equipment and materials to work in with other critical work activities and sub-contractors to ensure works progressed well. Jock worked with the tight timeframes we gave him and was happy to take the time to explain things when needed. It was great to see first-hand the difference surface preparation makes in the success of landscaping treatments, it is a lesson I will take with me to future projects".
— Stephen Mount, Environmental Engineer
The finished product was 100% coverage and occurred within two weeks.
Growgrass™ was engaged by Saipem Australia to provide services in rapidly establishing ground cover along a 420km Gas Transmission Pipeline (GTP) in Central Queensland. From my first consultation with Jock when seeking information, it was apparent that he had a great deal of experience and was more than happy to provide information.
Jock provided us with advice on products, machines and techniques that would suit our project and provided information on where we could attain these. At this stage Growgrass™ had not been awarded any work, and Jock was still happy to provide information above and beyond what was required and was really great to deal with. We used Growgrass™ to rapidly establish vegetative cover in high-risk areas such as steep slopes and the banks of high-value watercourses. Jock provided a machine that was suitable to access all these areas and had the capacity to complete them in an efficient manner.
The finished product was 100% coverage and occurred within two weeks. Even in areas of rocky or low fertility soils we had great success, which I attribute to Jocks product knowledge and application by his staff. Growgrass™ showed great flexibility and were willing to help us out, by extending their roster at short notice to secure areas of vulnerability before predicted rainfall events.
Growgrass™ worked along the entire length of the GTP Right of Way (RoW) from Arcadia Valley to Gladstone, working amongst difficult terrain and isolated areas. The Growgrass™ staff at all times abided by project safety requirements and attended the daily pre-starts, tool-boxes and safety briefings of a number of different crews.”
— Dylan McWhinney, Rehabilitation Environmental Coordinator, Saipem Australia Pty. Ltd.
Growgrass™ were able to provide us with a cost effective soft-scape solution at very short notice to rehabilitate some very steep batters on the Toowoomba Range Remediation Project. Jock and his team were very easy to work with, having flexibility in program of works with their set up of equipment and materials to work in with other critical work activities and sub-contractors to ensure works progressed well. Jock worked with the tight timeframes we gave him and was happy to take the time to explain things when needed. It was great to see first-hand the difference surface preparation makes in the success of landscaping treatments, it is a lesson I will take with me to future projects".
— Stephen Mount, Environmental Engineer
The finished product was 100% coverage and occurred within two weeks.
Growgrass™ was engaged by Saipem Australia to provide services in rapidly establishing ground cover along a 420km Gas Transmission Pipeline (GTP) in Central Queensland. From my first consultation with Jock when seeking information, it was apparent that he had a great deal of experience and was more than happy to provide information.
Jock provided us with advice on products, machines and techniques that would suit our project and provided information on where we could attain these. At this stage Growgrass™ had not been awarded any work, and Jock was still happy to provide information above and beyond what was required and was really great to deal with. We used Growgrass™ to rapidly establish vegetative cover in high-risk areas such as steep slopes and the banks of high-value watercourses. Jock provided a machine that was suitable to access all these areas and had the capacity to complete them in an efficient manner.
The finished product was 100% coverage and occurred within two weeks. Even in areas of rocky or low fertility soils we had great success, which I attribute to Jocks product knowledge and application by his staff. Growgrass™ showed great flexibility and were willing to help us out, by extending their roster at short notice to secure areas of vulnerability before predicted rainfall events.
Growgrass™ worked along the entire length of the GTP Right of Way (RoW) from Arcadia Valley to Gladstone, working amongst difficult terrain and isolated areas. The Growgrass™ staff at all times abided by project safety requirements and attended the daily pre-starts, tool-boxes and safety briefings of a number of different crews.”
— Dylan McWhinney, Rehabilitation Environmental Coordinator, Saipem Australia Pty. Ltd.